The activities in the field of energy which ProMIS has been carrying out since 1999 focus on the establishment of turn-key Hydro Electric Power Plants (HEPP); several projects of different capacities have been successfully put into use.
Having carefully examined the performance factors of HEPP projects which have become very popular especially in recent years, ProMIS has determined its line to be only designing and putting into use turn-key projects. ProMIS, which believes that all responsibilities should be brought together under the roof of a single company for high-quality and high-performance projects, does not prefer to be involved in HEPP projects as a contractor although it has specialized in automation and electricity projects.
Having strengthened its profound knowledge in industrial automation with the skills developed in hydroelectric power plants in the course of time, ProMIS has determined the capacity of its experienced and qualified engineering team to be 5-6 HEPP projects in a year for the purpose of making no concessions on quality and performance. ProMIS Energy Group designs and supplies all of the following main components of a HEPP.
The activities of ProMIS Energy Group have been transferred to ProMIS Energy Ltd., which was established in 2008, and the energy projects were started to be carried out under the roof of a separate company. After the leave of Murat Yetis from the company partnership in the first half of 2011, the partners of PCS (www.pcs.com.tr) company Ugur Yigit and Tahir Batur joined to ProMIS Energy as company partners in May 2011.
ProMIS Energy, is designing and supplying all of the main components of a HEPP as mentioned below.
Hydraulic Turbines | Generators and Electrical Installation | Hydro-Mechanical Systems
Generator and Turbine Regulators | Pressure Sets | Lubrication, Drainage and Cooling Systems
Automation Units | Remote Control and Maintenance Systems
In new projects, optimum installation dimensions are analyzed and fixed investment cost is determined following feasibility and profitability studies. Fixed-price system offer which is provided in accordance with turn-key basis includes project management, basic and detailed engineering and the supply-installation-start-up of all devices and installations.
OUR REFERENCES
Energy

|
Company |
Power |
Year |
HEPP |
Works Done |
Turbine/Generator
Manufacturer |
|
Bereket Enerji |
35 MW |
1999 |
Dalaman
I-II-III-IV-V * |
SCADA/Automation
Commissioning |
China/Germany |
|
Maraş Enerji |
2 x 4.8 MW |
2009 |
Firnis * |
Electrical Cabling
SCADA/Automation
Commissioning |
Norway/Spain |
|
Yenigün Enerji |
2 x 3.2 MW |
2010 |
Posof III ** |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
Austria/Poland |
|
Gürüz Enerji |
1 x 1.1 MW
1 x 0.45 MW |
2010 |
Tuztaşı ** |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
China/China |
|
Essentium Enerji |
1 x 8.5 MW
1 x 5.25 MW |
2011 |
Merekler ** |
EM Mounting
Switchgear Design/Application
Commissioning |
Austria/Spain |
|
Uslu Enerji |
2 x 8.05 MW
1 x 4.05 MW |
2011 |
SAF I |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
China/China |
|
Peker Enerji |
2 x 4.6 MW
1 x 1.9 MW |
2011 |
Serge |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
China/China |
|
Peker Enerji |
2 x 3.4 MW
1 x 1.36 MW |
2011 |
Tuzlaköy |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
China/China |
|
Üründül Enerji |
2 x 6.9 MW
1 x 2.75 MW |
2011 |
Yeşilırmak |
EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning |
China/China |
|
* Done with the business partnership of Murat Yetis. ** Commissioned during the period of company partnership of Murat Yetis. |